Transportation complete

We loaded part one and two of the ‘horn’ (joined),  on to the truck at 8pm on Friday night in the pouring rain. As soon as we had finished securing the load,  the rain stopped… We were all absolutely soaked through and my hair was plastered to my head as though I had been swimming!

We left the house at 7.15 the next morning en route for Kingston St Mary. A convoy of one truck and one car. David, Chris and myself were allocated the lifting whilst Peter’s role was as official photographer (and for a thirteen year old, I think he did a pretty good job).  Luckily it was not raining and although the garden was full of early morning wetness, the sun was shining and the trees and plants looked fantastic.

The first load was the most problematical but the second load was a complete doddle.

Tuesday is installation day and is everybody happy??? I shall be if it doesn’t rain!

P1020259

P1020267

P1020271

P1020273

P1020286

P1020302

P1020324

P1020326

P1020331

P1020344

P1020350

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s